How to Tile a Bathroom
Tiling a bathroom is a sequence of jobs, and most of the work happens before the first tile goes on. This guide walks through each stage in order, with notes on the parts worth leaving to a tiler.
1. Remove old tiles and check the walls
Start by removing old tiles and adhesive back to a sound surface. Tiling over old tiles is sometimes possible, but in a bathroom it hides the condition of the walls and any waterproofing behind them. Once the walls are bare, check for blown or crumbling plaster, loose plasterboard, damp, and walls that are badly out of flat. Problems found now are far easier to put right than after tiling.
2. Prepare the walls and floor
Walls need to be sound, clean and flat. Weak or uneven walls are boarded with tile backer board, and plaster is primed before tiling. Floors need to be stiff and level: loose boards are fixed, timber floors are usually overboarded, and dips are levelled. If walls are being moved or pipes boxed in, that happens now, before any boarding or waterproofing.
3. Waterproof the wet areas
Inside the shower and on the walls around the bath, tiles and grout aren't waterproof on their own. A tanking system, either a membrane or a liquid coating with tapes at joints and corners, goes on before tiling, following the manufacturer's instructions. This is the stage most worth getting right, because mistakes stay hidden until water damage appears.
4. Set out the tiles
Before fixing anything, plan where the tiles will fall. Mark a level line for the first full row, often just above the bath or shower tray rather than at the floor, and work out where the cuts land at corners, the window, the end of the bath and any niche. Aim for balanced cuts at both edges rather than a full tile on one side and a thin sliver on the other. On the floor, start from the doorway or the most visible line in the room.
5. Mix and spread the adhesive
Use an adhesive suited to the tile, the surface and the room, usually a flexible cement-based adhesive for porcelain, larger tiles, boards and floors. Mix only what you can use within its working time, spread it with a notched trowel suited to the tile size, and bed each tile firmly so there are no hollow spots. Follow the manufacturer's instructions for mixing and curing.
6. Cut around fittings
Straight cuts are made with a tile cutter; holes for pipes and shaped cuts need a tile saw or hole cutters. Ceramic is easier to cut than dense porcelain or stone. Clean, accurate cuts around taps, pipes and the window are what make a bathroom look professionally tiled.
7. Grout
Once the adhesive has cured, work grout fully into each joint and clean the surface before it hardens. In a bathroom, use a grout suitable for wet areas. Leave the joints between the tiles and the bath, tray or basin, and the internal corners, free of grout.
8. Seal with silicone
Those movement joints are sealed with a sanitary silicone, applied in a continuous bead and smoothed off. Natural stone may also need sealing before and after grouting.
What's worth leaving to a tiler
Waterproofing, setting out on uneven walls, large-format tiles, natural stone and floors over timber are where small mistakes become costly to fix. Robert strips out, prepares, waterproofs and tiles bathrooms, and can redecorate the rest of the room once the tiling is done.
Robert Rajz is an NVQ Level 3 tiler with 18 years' experience, based in West Ealing, W13. He holds a Gold CSCS card, is DBS checked and fully insured, and is rated 5/5 on MyBuilder and 10/10 on Checkatrade.
FAQ
Common questions
How long does tiling a bathroom take? +
It depends on the size and the prep needed. We'll give you a realistic timeline with your quote.
Do you tile walls or floor first? +
It varies with the job. Walls are often tiled first so the floor isn't damaged by work above it; sometimes the floor goes down first so the wall tiles sit on it. The setting out and the position of the bath or tray usually decide.
How long before I can shower? +
Only once the adhesive, grout and silicone have fully cured. Curing times vary by product and conditions, so follow the manufacturer's instructions.
Free quote
Tell us about your job
Tiling in West London?
Call Robert on 07427 725086 or request a free quote.
Based in West Ealing, W13. We cover North West London, South West London, Central London and North London. Other areas considered on request.
Area pages: West Ealing · Ealing · Isleworth · Putney · Wimbledon · Brixton · Lewisham · Hanwell